Boulder High School Project

Project Owner

Boulder Valley School District, RE-2

Partners

Pinkard | General Contractor | Jack Quandt | 303-986-4555
Klipp | Architect | Greg Cromer | 303-893-1990
R.J. McNutt| Electrical Engineer | 970-330-3266

Location

Boulder, Colorado

Project Duration

May 2008 – January 2009

Why Weifield?

Weifield Group was chosen for this project due to our strict attention to quality and value engineering provided in our pricing.

Project Scope:

For this $950K project, Weifield Group performed a complete remodel of sections in the existing facility, including the addition of new administration offices, new gym and locker rooms, and a new backstage area.  Weifield Group also upgraded the fire alarm, clock, and other low voltage systems.

Project Challenges Overcome Through a Focus on Pre-Construction and Details

Weifield Group completed a comprehensive preconstruction layout and did several walkthroughs of the building before the project started to ensure we had a firm grip on all necessary details. Our layout drawings were instrumental in helping us complete installation on-time and within budget.  Throughout the project, we conducted weekly job site meetings with the construction and safety managers to review project-specific conditions.  We kept everyone on the same page regarding project scope and schedule.  We faced abatement delays and had to conduct our work in a partially occupied building.  We were able to navigate these challenges for a successful outcome.

Safety

This project encompassed 17,126 man hours, had no recordable accidents, and no lost time.