BRAC Infrastructure Support Project

Project Owner

The U.S. Air Force

Partners

Kiewit Western | General Contractor | Nathan Mares | 303-921-8901
Army Corps of Engineers | Architect
AES Group, Inc. | Electrical Engineer | J. Russ Odum | 303-841-3922

Location

Buckley Air Force Base – Aurora, Colorado

Project Duration

October 2008 – May 2009

Why Weifield?

Weifield Group was chosen for this project based on our cost effectiveness and highly qualified personnel.

Project Scope:

For this project, the Weifield Group performed work on the BRAC infrastructure.  Our team implemented a medium voltage duct bank, manholes, communications duct bank and street lighting, consisting of 47 light poles and solar powered traffic signals.

An Organized, Coordinated, and Prepared Approach to Construction

Weifield Group created a purchasing and labor management plan based on our building strategy prior to mobilization.  This project was successful because we employed diligent management of our resources, benefiting our firm and our partners.

Safety:

Weifield Group’s safety manager developed a site specific safety plan.  The plan included the highest standard personal protective equipment, regular safety and training meetings, and job hazard analysis.  This project had no recordable accidents and no lost time.