BRAC Infrastructure Support Project
Project Owner
The U.S. Air Force
Partners
Kiewit Western | General Contractor | Nathan Mares | 303-921-8901
Army Corps of Engineers | Architect
AES Group, Inc. | Electrical Engineer | J. Russ Odum | 303-841-3922
Location
Buckley Air Force Base – Aurora, Colorado
Project Duration
October 2008 – May 2009
Why Weifield?
Weifield Group was chosen for this project based on our cost effectiveness and highly qualified personnel.
Project Scope:
For this project, the Weifield Group performed work on the BRAC infrastructure. Our team implemented a medium voltage duct bank, manholes, communications duct bank and street lighting, consisting of 47 light poles and solar powered traffic signals.
An Organized, Coordinated, and Prepared Approach to Construction
Weifield Group created a purchasing and labor management plan based on our building strategy prior to mobilization. This project was successful because we employed diligent management of our resources, benefiting our firm and our partners.
Safety:
Weifield Group’s safety manager developed a site specific safety plan. The plan included the highest standard personal protective equipment, regular safety and training meetings, and job hazard analysis. This project had no recordable accidents and no lost time.