City of Denver | Owner
GH Phipps Construction | General Contractor
PK Electrical | Engineer
Burns & McDonnell | Architect
PROJECT DURATION: September, 2021 – December, 2023
PROJECT TYPE: Aviation
PROJECT DESCRIPTION: This project is comprised of the removal of three boilers within the DEN Central Utility Plant, which will be replaced with five new 20,000,000 BTU boilers as well as new pumps, variable frequency drives (VFDs), supporting electrical, structural, life safety, instrumentation, and controls equipment. The project will be phased to ensure continuous use of heating water and chilled water services throughout the airport facilities.