Weifield and our project partners were excited to place and connect a 44,000-lb. prefabricated electrical building at the City of Northglenn Lift Station project we are building with J.R. Filanc Construction Company (GC)!
The electrical building was built by Metron and provided by our industry partner, Browns Hill Engineering, the system integrator; it houses all the electrical gear for the site – including the Motor Control Center, VFDs, panel boards, and PLC. The structure was put into place by ProLift Rigging who, due to the extreme winds that were a factor in recent days, was able to reschedule the lift at the last-minute.
Our Industrial General Superintendent, Scott Dick, would like to thank all of our partners who were integral to the success of procuring, building, and placing the structure – as well as our amazing team – Chris W. (Superintendent), David M. (Journeyman), Kerry W. (PM), Tyshane Y. (Apprentice), William B. (Apprentice), and Maximus S. (Apprentice). Said Scott: “This crew is also being recognized as Crew of the Month and I could not be MORE PROUD of every single one of them!”
Fantastic work, team!!