Arapahoe County Water and Wastewater Authority | Owner
HPM | General Contractor
AE2S | Engineer
PROJECT DURATION: April, 2022 – July, 2022
PROJECT TYPE: Water/Waste Water, Design-Assist
PROJECT DESCRIPTION: This design-assist project for Arapahoe County is our Industrial team’s first project with HPM (GC); it is comprised of the rehabilitation of a lift station and a reconfiguration for continued operation and to mitigate risk of future failures.