CLIENT: City of Aurora Water
GC: Velocity
ENGINEER: Kennedy/Jenks Consultants
PROJECT DURATION: April 2022 – April 2023
PROJECT TYPE: Hard Bid
DESCRIPTION: This project consists of 24 existing medium voltage (MV) PME switches being replaced in a 60-day shutdown. The remaining project consists of six (6) completely new vaults.