CLIENT:  City of Aurora Water

GC:  Velocity

ENGINEER:  Kennedy/Jenks Consultants

PROJECT DURATION:  April 2022 – April 2023

PROJECT TYPE:  Hard Bid

DESCRIPTION:  This project consists of 24 existing medium voltage (MV) PME switches being replaced in a 60-day shutdown. The remaining project consists of six (6) completely new vaults.