Blue Mountain Water District | Owner
Glacier Construction | General Contractor
Vista Engineering | Engineer
PROJECT DURATION: July, 2021 – July, 2022
PROJECT TYPE: Water/Waste Water
PROJECT DESCRIPTION: This project includes construction of a rectangular, 100,000-gallon concrete water storage tank adjacent to an existing 50,000-gallon water storage tank, including a vault that houses six fixtures, eight receptacles, float switches, and a flow control panel.