Boulder Valley School District | Owner
Saunders Construction | General Contractor
RB + B Architects, Inc. | Architect
MKK, Inc. | Electrical Engineer
PROJECT TYPE: Hard Bid
COMPLETION DATE: April 2010
PROJECT CONTRACT: $2.1M
The first LEED Platinum School in Colorado! This 110,000 sq. ft. middle school has two original walls that were salvaged, and the new school was constructed around these two existing walls. Design included a 26.78 kW photovoltaic array to assist with onsite power generation.