Boulder Valley School District | Owner

Saunders Construction | General Contractor

RB + B Architects, Inc. | Architect

MKK, Inc. | Electrical Engineer

PROJECT TYPE: Hard Bid

COMPLETION DATE:  April 2010               

PROJECT CONTRACT: $2.1M

The first LEED Platinum School in Colorado! This 110,000 sq. ft. middle school has two original walls that were salvaged, and the new school was constructed around these two existing walls.  Design included a 26.78 kW photovoltaic array to assist with onsite power generation.