City of Cheyenne, Board of Public Utilities | Owner
Glacier Construction | General Contractor
Burns & McDonnell | Electrical Engineer
PROJECT DURATION: August 2017 – March 2018
PROJECT TYPE: Water/Waste Water
PROJECT DESCRIPTION: The Cheyenne Southern Sewer Interceptor Main project consists of a brand new 4.0 MGD pump station with a backup power system, two 50 HP pumps, instrumentation and controls, and general power and lighting. The pump station, sized for future expansion, feeds the Crow Creek Reclamation Facility and communicates with a 30’ tall antenna, engineered to withstand the harsh Wyoming winds. Additionally, Weifield Group installed two remote metering manholes to monitor flow along the 2.78 miles of pipeline that were installed on this project.