City of Longmont | Owner
Glacier Construction Co. | General Contractor
Carollo Engineers | Electrical Engineer
PROJECT DURATION: Feb. 2015 – Nov. 2015
PROJECT TYPE: Water/Waste Water
PROJECT CONTRACT: $767,000
The Longmont Reclamation Facility project involved the replacement of four thickened sludge pumps in the Sludge Control Building and Thickener two Building, as well as the replacement of one primary sludge pump and electrical/instrumentation. This project also included replacement of duplex sump pumps in two locations and replacement of corroded electrical conduits, along with the replacement of a waste gas burner and modification of associated sludge gas process instrumentation.