Colorado School of Mines | Owner
Weifield Group | General Contractor
RMH Group, Inc. | Engineer
PROJECT DURATION: November, 2021 – June, 2022
PROJECT TYPE: Education
PROJECT DESCRIPTION: This project is comprised of the replacement of three existing UPS’s with two 225K UPS’s, as well as the addition of one transformer and two panelboards. The project also includes low voltage gear, feeders, power, tele data, grounding, demolition and temporary power. There will be phased shutdowns where the building will be powered with temporary generators.