Denver Botanic Gardens | Owner

Mortenson Construction | General Contractor

Davis Partnership Architects | Architect

BCER Engineering | Engineer

PROJECT DURATION: April 2018 – May 2019

PROJECT TYPE: Design Assist, Retail

PROJECT DESCRIPTION: This project is a a new construction 106,000 sq. ft. center for a Science, Art, and Education (CSAE) building at the Denver Botanic Gardens — including two levels (29,000 total sq. ft.) of below-grade parking. The new building includes two levels of above-grade library, gallery, learning, and auditorium areas.