Denver Center for International Studies | Owner

Martinez Fire Protection | General Contractor

Veritas Fire Engineering | Engineer

PROJECT DURATION: June, 2021 – August, 2021

PROJECT TYPE: Design-Build

PROJECT DESCRIPTION: This project involves installation of up to 16 terminal points for fire alarm equipment and the furnish/install of two elevator shunt trip breakers.

Related Projects

Start typing and press Enter to search