ECCV | Owner
Weifield Group | General Contractor
Weifield Group | Engineer
PROJECT DURATION: June 2018 – November 2018
PROJECT TYPE: Water/Waste Water, Design-Build
PROJECT DESCRIPTION: Weifield is the GC for this project for East Cherry Creek Valley Water & Sanitation District which was an installation of a power connection for a mobile Pilot RO that was being relocated.