CLIENT: City of Firestone
GC: Nelson Pipeline
PROJECT DURATION: July 2024 – August 2024
PROJECT TYPE: Plan-Spec
DESCRIPTION: This project is a new development raised grade elevation around the city’s water pressure vault; the vault was flooded and the entire electrical system and vault system needs to be raised to new elevated grade.