CLIENT:  Warren Air Force Base

GC:  Bryan Construction

ENGINEER:  PEC

ARCHITECHT:  Yaeger Architecture

PROJECT DURATION:  June 2024 – August 2026

PROJECT TYPE:  Plan-Spec

DESCRIPTION:  This project is a fully designed project to construct two large structures: a Missile Handling Facility and a combined Transporter Storage Facility and Missile Handling Administrative Facility for the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at FE Warren Air Force Base.