CLIENT: Warren Air Force Base
GC: Bryan Construction
ENGINEER: PEC
ARCHITECHT: Yaeger Architecture
PROJECT DURATION: June 2024 – August 2026
PROJECT TYPE: Plan-Spec
DESCRIPTION: This project is a fully designed project to construct two large structures: a Missile Handling Facility and a combined Transporter Storage Facility and Missile Handling Administrative Facility for the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission at FE Warren Air Force Base.