CLIENT:  City of Longmont

GC:  Garney Construction

ENGINEER:  Burns & McDonnell

PROJECT DURATION:  October 2022 – December 2024

PROJECT TYPE:  Hard Bid

DESCRIPTION:  This project consists of a replacement of the existing water storage reservoir with a new above-ground tank. The contract provides for the demolition of electrical systems in the maintenance building, the filter building’s 7MG tank, a pump station, and vaults. Weifield will install new duct banks, manholes with cable racks, low voltage gear, emergency generator, instrumentation & controls, lighting, security and an access control panel; our team will also provide temporary power/control as necessary to the existing PRV vaults during construction — as well as lightning protection for the electrical building and water storage tank.