Newmont Goldcorp | Owner

Saunders Construction | General Contractor

ME Engineers | Engineer

Gensler | Architect

PROJECT DURATION: January 2020 – August 2020

PROJECT TYPE: Hard Bid

PROJECT DESCRIPTION:  This project is a first generation tenant improvement of a Newmont Mining office building; construction spans five floors (floors 6-10) and 180,000 sq. ft. with the inclusion of a new interconnecting stair. The project includes a dense individual office layout, flexible meeting spaces and a training center on level 6, executive offices on the 10th floor, and a Class A lighting package on level 5, inclusive of a linear slot for the standard office and decorative finishes throughout the circulation areas. The lighting control design for this project complies with 2015 IECC and integrates with all building systems.

Related Projects

Start typing and press Enter to search