1000 Chopper Circle | Owner | Stan Kroenke
Mortenson | General Contractor | Paul Giovannetti
PROJECT TYPE: Design-Build
PROJECT DURATION: Aug. 2015 – Dec. 2015
PROJECT CONTRACT: $1.5M
This project consisted of a state-of-the-art electrical lighting system(s) upgrade to the following features: Crown, Beacons, and Solid Façade of the existing Pepsi Center building.