SCL Health PVMC | Owner
GH Phipps | General Contractor
Cator Ruma | Engineer
Boulder Associates | Architect
PROJECT DURATION: September 2018 – April 2019
PROJECT TYPE: Healthcare
PROJECT DESCRIPTION: This project is a 19,000 sq. ft. third floor surgical renovation with full demolition and build-back. The build-back consists of 28 patient recovery rooms with four total nurse stations throughout the quadrants of the floor.