Raytheon – JLL | Owner

Swinerton Builders | General Contractor

Page Sutherland Page, Inc. | Engineer

Page Architects | Architect

PROJECT DURATION: October 2018 – January 2019

PROJECT TYPE: Mission Critical, Design-Assist

PROJECT DESCRIPTION: This project is a renovation of existing office spaces into a 8,500 sq. ft. data center. The project included replacement and upgrades to two transformers, UPS, installation of electrical support to 140kW and 280kW rack loads, busway system, fire alarm, electrical panels, and switchgear. Due to the complexity of the schedule, all electrical work was conducted within seven days to ensure ongoing business operations were not disrupted.