CLIENT: Colorado Springs Utilities (CSU)
GC: Glacier Construction
ENGINEER: Plummer
PROJECT DURATION: March 2024 – April 2024
PROJECT TYPE: Plan Spec
DESCRIPTION: This project is comprised of the construction of two new wastewater pump lift stations including a below-grade influent wet well, a below-grade dry pit with four pumps, emergency wastewater storage tank, above-grade operations building housing a standby generator, and electrical gear.