CLIENT: Signature Science LLC
GC: Flynn Construction
ENGINEER: Page Southerland Page, Inc.
ARCHITECHT: Page Architects
PROJECT DURATION: April 2023 – September 2023
PROJECT TYPE: Plan-Spec
DESCRIPTION: This project consists of 6,520 sq. ft. of third floor renovations for office and sensitive compartmented information facility interiors. The project will involve minor demolition, minor concrete, steel and miscellaneous metals, millwork and countertops, TPO roof cutting and patching, insulation, roof accessories, firestopping, sealants, glass and glazing, glass film, doors, frames, and hardware, RF shielding, framing and drywall, acoustical panel ceilings, resilient flooring and base, carpet tile, interior and exterior painting, wall and door protection, toilet partitions & accessories, fire extinguishers and cabinets, fire sprinkler, plumbing, mechanical, electrical, and fire alarm work as required. The work will be performed in a single mobilization in an existing, unoccupied office space on the third floor of an occupied building.