City of Thornton | Owner

Glacier Construction | General Contractor

Carollo/Burn & McDonnell | Engineer

PROJECT DURATION: July 2020 – February 2021

PROJECT TYPE: Water/Waste Water

PROJECT DESCRIPTION:  This project will involve installation of a new pump and variable frequency drive and replacement of piping and instrumentation so that water and air supply for Train 8 match the other seven membrane trains in the facility. The City of Thornton is modifying Membrane Train 8 at the Wes Brown Water Treatment Plant; Train 8 will be converted from a secondary recovery train to a forward flow operating train to match trains 1-7.