UCHealth | Owner
TKM GmbH | General Contractor
AEI Engineering | Engineer
BSA Lifestructures | Architect
PROJECT DURATION: March, 2022 – October, 2022
PROJECT TYPE: Healthcare
PROJECT DESCRIPTION: This project is a buildout of the core and shell 4th floor at the UCHealth Greeley Hospital. Weifield’s electrical scope includes new lighting, power, mechanical, fire alarm, nurse call and gear; a new 800kW generator and a new cable tray and LV pathways will be installed.