CBRE | Owner
Howell Construction | General Contractor
DLR Group | Engineer
DLR Group | Architect
PROJECT DURATION: June 2017 – September 2017
PROJECT TYPE: Corporate
PROJECT DESCRIPTION: This project was an expansion of the Vertafore Headquarters, previously on the 7th floor, onto the 6th floor of the same building.