CBRE | Owner

Howell Construction | General Contractor

DLR Group | Engineer

DLR Group | Architect

PROJECT DURATION: June 2017 – September 2017

PROJECT TYPE: Corporate

PROJECT DESCRIPTION: This project was an expansion of the Vertafore Headquarters, previously on the 7th floor, onto the 6th floor of the same building.