City of Northglenn | Owner

Moltz Construction, Inc. | General Contractor

Browns Hill Engineering & Controls | Electrical Engineer

PROJECT DURATION: May, 2016 – May, 2017

PROJECT TYPE: Water/Waste Water

PROJECT CONTRACT: $2.1M

Construction of a headworks building with mechanical screening, grit removal and handing, and odor control. Complete electrical system to include new 3,200 amp service with ATS, MCC, and VFD’s.  Instrumentation to include magnetic flow meters, pressure transducers, level transmitters, pressure switches and relay level switches all to monitor integration into their existing SCADA system. Additionally, the project includes installation of a new 1,500kW diesel fuel standby generator for emergency power failure.