Colorado Springs Utilities (CSU) | Owner
MWH | General Contractor
Stantec | Engineer
PROJECT DURATION: September, 2021 – April, 2022
PROJECT TYPE: Water/Waste Water
PROJECT DESCRIPTION: This project is a continuation of the original project involving upgrades to the existing 43 million gallons per day (MGD) drinking water treatment facilities at the CO Springs Utilities’ Mesa Water Treatment Plant.