City of Englewood | Owner
Weifield Group | General Contractor
PROJECT DURATION: September, 2021 – December, 2021
PROJECT TYPE: Water/Waste Water, Design-Assist
PROJECT DESCRIPTION: This project involves the replacement of eight variable frequency drives (VFDs) that are at the end of their useful life; these VFD’s control three return pumps at the Secondary Solids Pump Station.