ECCV Water & Sanitation District | Owner
Garney Construction | General Contractor
CDM Smith | Engineer
PROJECT DURATION: Mar. 2017 – Sept. 2017
PROJECT TYPE: Water/Waste Water
The DI-2 Deep Well Injection System project included the furnishing and installation of a number of medium voltage transformers, site work, process instrumentation, lightning protection, and the interconnection of a pump building housing two 1000 HP pumps to a large electrical room. The project also includes the installation of one mile of single mode fiber optic cable to connect the well site to an existing RO facility.