East Cherry Creek Valley Water District | Owner
Weifield Group | General Contractor
PROJECT DURATION: September 2018
PROJECT TYPE: Water/Waste Water, Design-Assist
PROJECT DESCRIPTION: For this design-assist project, Weifield helped with the design and execution of the relocation of the Maximum Power Transfer Solution (MPTS) equipment from Pump Station SA/SL-10 to the main ECCV offices.