City of Thornton | Owner

Weifield Group | General Contractor

Carollo | Engineer

PROJECT DURATION: September 2018 – January 2019

PROJECT TYPE: Water/Waste Water

PROJECT DESCRIPTION: This project will be run by Weifield as the general contractor with the City of Thornton. The project consists of the replacement of major equipment at the West Gravel Lakes Pump Station to simplify the distribution system and is the beginning of a multiple-phase project with the city.

Related Projects

Start typing and press Enter to search