Ivinson Memorial Hospital | Owner
Haselden Construction | General Contractor
BCER Engineering, Inc. | Electrical Engineer
H+L Architecture | Architect
PROJECT DURATION: May 2016 – July 2017
PROJECT CONTRACT: $2.1M
Fully designed, ground-up 27,000 square-foot medical office building that also includes a remodel of other areas of the Ivinson Memorial Hospital.