Kaiser | Owner

Alvarado Construction | General Contractor

PROJECT DURATION: November, 2019 – December, 2019

PROJECT TYPE: Healthcare, Design-Assist

PROJECT DESCRIPTION: Trace out circuitry and lockout tag out circuits for the below work. Safe off and disconnect equipment to be removed. Safe off conduits back to nearest J-boxes as needed.

Related Projects

Start typing and press Enter to search