Kaiser | Owner
Alvarado Construction | General Contractor
PROJECT DURATION: November, 2019 – December, 2019
PROJECT TYPE: Healthcare, Design-Assist
PROJECT DESCRIPTION: Trace out circuitry and lockout tag out circuits for the below work. Safe off and disconnect equipment to be removed. Safe off conduits back to nearest J-boxes as needed.