Kaiser | Owner

Alvarado Construction | General Contractor

Mazzetti Engineers | Engineer

Ware Malcomb | Architect

PROJECT DURATION: January, 2020 – May, 2020

PROJECT TYPE: Healthcare, Design-Build

PROJECT DESCRIPTION: Trace out circuitry and safe off circuit(s) to Safes during demolition phase. Reconnect up to 2 – Safes at each location.