Metro Wastewater Reclamation District | Owner

Glacier Construction Co., Inc. | General Contractor

Carollo | Electrical Engineer

PROJECT DURATION:  Jan. 2017 – Aug. 2017

PROJECT TYPE: Water/Waste Water

For this project, Weifield decommissioned a lift station, hydrogen peroxide feed facility, and a number of cathodic protection sites in the first phase of the project. In the second phase, we installed a new NEMA 4X control panel to control a biofilter alarm vault.