Metro Wastewater Reclamation District | Owner
Glacier Construction Co., Inc. | General Contractor
Carollo | Electrical Engineer
PROJECT DURATION: Jan. 2017 – Aug. 2017
PROJECT TYPE: Water/Waste Water
For this project, Weifield decommissioned a lift station, hydrogen peroxide feed facility, and a number of cathodic protection sites in the first phase of the project. In the second phase, we installed a new NEMA 4X control panel to control a biofilter alarm vault.