City of Longmont | Owner
Moltz Construction | General Contractor
CH2M Hill | Electrical Engineer
PROJECT DURATION: Dec. 2016 – Feb. 2017
PROJECT TYPE: Water/Waste Water
Prompted by a new legal requirement for grit disposal, Weifield provided temporary power for two existing grit handling units during the install of two new GHU’s with associated local control panels, PLC modifications, and new power panels.