North Weld County Water | Owner

Moltz Construction | General Contractor

Province Infrastructure Consultants, Inc. | Engineer

PROJECT DURATION: May 2019 – August 2019

PROJECT TYPE: Water/Waste Water

PROJECT DESCRIPTION: This is a new Booster Pump Station replacing an existing Booster Pump Station for the North Weld County Water District. For this project, Weifield is connecting from a new utility transformer to a rack-mounted 480v disconnect. From that disconnect, Weifield is running a duct bank to connect to a new 480v transformer installed within the vault of the pump station.