North Weld County Water | Owner
Moltz Construction | General Contractor
Province Infrastructure Consultants, Inc. | Engineer
PROJECT DURATION: May 2019 – August 2019
PROJECT TYPE: Water/Waste Water
PROJECT DESCRIPTION: This is a new Booster Pump Station replacing an existing Booster Pump Station for the North Weld County Water District. For this project, Weifield is connecting from a new utility transformer to a rack-mounted 480v disconnect. From that disconnect, Weifield is running a duct bank to connect to a new 480v transformer installed within the vault of the pump station.