Soldier Canyon Water Treatment Authority | Owner

Garney Construction | General Contractor

Stantec | Engineer

PROJECT DURATION: May 2019 – May 2021

PROJECT TYPE: Water/Waste Water

PROJECT DESCRIPTION: This project is comprised of the construction of a 30 million gallon per day (MGD) pretreatment facility, a chlorine contact tank, and solids decant pond for a 60 MGD filtered water system. The work will result in a water filtration plant with full 60 MGD capacity.