University of Colorado | Owner

Howell Construction | General Contractor

RMH Group | Engineer

CannonDesign | Architect

PROJECT DURATION: January 2020 – September 2020

PROJECT TYPE: Infrastructure, Design-Build, Design-Assist

PROJECT DESCRIPTION: This design-build core & shell project to expand the steam and chilled water generation capacity at the University of Colorado Anschutz Medical Campus Central Utility Plant (CUP). This is being done by installing a new boiler in place of (1) one existing boiler, expand the CUPs chilled water capacity by installing a new chiller, and upgrade the CUPs electrical, security and structural systems to support the new equipment.