University of Colorado | Owner
Howell Construction | General Contractor
RMH Group | Engineer
CannonDesign | Architect
PROJECT DURATION: January 2020 – September 2020
PROJECT TYPE: Infrastructure, Design-Build, Design-Assist
PROJECT DESCRIPTION: This design-build core & shell project to expand the steam and chilled water generation capacity at the University of Colorado Anschutz Medical Campus Central Utility Plant (CUP). This is being done by installing a new boiler in place of (1) one existing boiler, expand the CUPs chilled water capacity by installing a new chiller, and upgrade the CUPs electrical, security and structural systems to support the new equipment.